Project Details

Commercial roof coating restoration

Commercial roof coating restoration

Commercial roof coating restoration

This ageing flat roof on a small retail complex was beginning to suffer from minor leaks and surface deterioration caused by prolonged weather exposure. A full roof replacement was not required, so a premium elastomeric coating system was applied to restore waterproofing, improve thermal performance, and extend the roof’s lifespan by more than a decade — without disrupting business operations.

Client

James P.

Client

James P.

Client

James P.

Type

Commercial

Type

Commercial

Type

Commercial

Duration

3 days

Duration

3 days

Duration

3 days

Year

2025

Year

2025

Year

2025

Property type

Retail unit with flat modified bitumen roofing system

Property type

Retail unit with flat modified bitumen roofing system

Property type

Retail unit with flat modified bitumen roofing system

Location

Croydon, London

Location

Croydon, London

Location

Croydon, London

Services

Roof inspection, surface preparation, elastomeric coating system installation

Services

Roof inspection, surface preparation, elastomeric coating system installation

Services

Roof inspection, surface preparation, elastomeric coating system installation

Materials

White reflective acrylic elastomeric coating, seam reinforcement tape, commercial-grade primer

Materials

White reflective acrylic elastomeric coating, seam reinforcement tape, commercial-grade primer

Materials

White reflective acrylic elastomeric coating, seam reinforcement tape, commercial-grade primer

What we did

This project focused on efficient restoration without unnecessary strip-out or disruption.

Initial inspection and assessment

We began with a comprehensive assessment of the existing roof system.

  • Identified surface cracking, blistering, and areas of standing water

  • Carried out moisture testing and core sampling

  • Confirmed the roof structure remained sound and suitable for coating

  • Produced documentation to support warranty requirements

Roof surface prep and repair

Proper preparation ensured long-lasting results.

  • Pressure washed the entire roof surface to remove dirt and debris

  • Repaired cracks and low areas using sealant and reinforcement mesh

  • Strengthened seams with seam tape and primer

  • Protected roof edges, outlets, and HVAC units prior to coating application

Coating application

The coating system was applied with precision.

  • Applied a commercial-grade acrylic elastomeric coating in multiple layers

  • Ensured complete coverage, particularly around roof penetrations and details

  • Created a seamless, fully waterproof protective layer

  • Completed final inspection and coating thickness checks for warranty compliance

Challenges we faced

As with most commercial projects, careful planning was required.

  • Roof access coordinated around business trading hours

  • Standing water areas addressed with levelling compounds

  • Weather conditions managed between primer and topcoat application

Why this project stands out

This project delivered a cost-effective alternative to full replacement.

  • Improved reflectivity supporting lower cooling costs

  • Waterproof protection for more than 10 additional years

  • No strip-out, allowing uninterrupted trading

  • Eligible for renewable manufacturer warranties

Final result

The newly coated roof is clean, fully protected, and ready to withstand ongoing weather exposure. The building is now safeguarded against leaks and future deterioration, with minimal disruption to the businesses below.

man in white crew neck shirt wearing silver necklace
man in white crew neck shirt wearing silver necklace

James P.

Property Manager

We were concerned about the cost of a full roof replacement, but a far more practical solution was provided. The work was completed efficiently, with minimal disruption to tenants, and the result speaks for itself.

We were concerned about the cost of a full roof replacement, but a far more practical solution was provided. The work was completed efficiently, with minimal disruption to tenants, and the result speaks for itself.

Project Images

Every Angle, Every Detail

Project Images

Every Angle, Every Detail

Project Images

Every Angle, Every Detail